This is an archive of requests from 2013 to 2021. New requests are not being added here.
PROM Request Title PROM Date PROM Request Summary Equipment List PROM Decision
CCP PECVD on FOx-22 SOG 10/10/2014 (all day) Request to deposit dielectric material using CCP PECVD on FOx-22 SOG. PlasmaTherm Shuttlelock PECVD System (ccp-dep) Approved.
CCP PECVD on CYTOP 809M 10/10/2014 (all day) Request to deposit dielectric material using CCP PECVD on CYTOP 809M SOG. PlasmaTherm Shuttlelock PECVD System (ccp-dep) Approved.
InAs on GaAs piece in Fiji2 and Savannah 10/07/2014 (all day) Request to process InAs deposited on GaAs in gold-contamination ALD tools (Savannah and Fiji2). Fiji 2 ALD (fiji2),
Savannah ALD (savannah)
Approved for documented quantities. Pieces need to cool in load lock before retrieval on Fiji2.
Etching Y on MoS2 substrate at wbflexcorr 10/07/2014 (all day) Request to etch Y at wbflexcorr. Wet Bench Flexcorr 1 (wbflexcorr-1) Approved for documented quantities. Re-approval required if quantities change.
Dichlorosilane processing on Fiji1 09/22/2014 (all day) Request to use DCS precursor on Fiji1. Fiji 1 ALD (fiji1) Approved with modifications. Clarifications regarding DCS monitoring during processing added.
PS-OH use in SNF 09/18/2014 (all day) Request to use PS-OH polymer in SNF. Headway Manual Resist Spinner (headway2) Approved.
UV Cured adhesive use 08/29/2014 (all day) Request to use NOA89 or NOA75 in SNF. Approved.
Ionic Liquid on Woollam 08/13/2014 (all day) Request to use measure non-hazardous liquid electrolyte on Woollam. Woollam (woollam) Approved. Required to use a cap covered cuvette to transfer liquid across the lab.
PS-PMMA use in SNF 08/12/2014 (all day) Request to use PS-PMMA in SNF tools. Headway Manual Resist Spinner (headway2) Approved.
PGMEA use in SNF 08/12/2014 (all day) Request to use PGMEA in SNF tools. Headway Manual Resist Spinner (headway2) Approved.

Pages